2016 Wudongde Hydropower Dam Civil Engineering and Metal Structure Installation Engineering Osmosis Control Project Water Conservancy and Hydropower General Contracting Procurement Announcement

2016 Wudongde Hydropower Dam Civil Engineering and Metal Structure Installation Engineering Osmosis Control Project Water Conservancy and Hydropower General Contracting Procurement Announcement
The bidder intends to subcontract the construction of the construction project for the first phase of the Wudongde Hydropower Station dam civil engineering and metal structure installation engineering seepage control project. The project funds will come from the construction progress of the project owner. The project has tender conditions and is now undergoing open bidding.
3. Project overview and scope of tender
2.1 Project Overview: The Wudongde hydropower station on the Jinsha River is the most upstream cascade power station among the four hydropower stations (Udongde, Baihetan, Xiluodu, Xiangjiaba) on the lower reaches of the Jinsha River. This project focuses on power generation and flood control. Block sand and improve downstream shipping conditions and other comprehensive benefits.
2.2 The bidding project is mainly for the construction of the I-Bid Section of the Wudongde Hydropower Station Dam Civil Engineering and Metal Structure Installation Engineering Osmosis Control Project. The start-up to completion time is from November 1, 2016 to October 31, 2018. 720 days (or actual start and finish times).
2.3 The main project quantities of this tendering project: Consolidation grouting for the dam 1#~6# of the dam project, connecting the bank slope section of EL850m~EL988m on the left bank, the main curtain grouting and the foundation drainage hole, and the bank slope contact grouting project, the main project Quantity: Consolidation grouting 54358m, connecting curtain, main curtain grouting 19465m, drainage hole 1691m, bank slope contact grouting 10151m2.
4. Bidder qualification requirements
4.1 has an independent legal personality;
4.2 It must have water conservancy and hydropower general contracting, or foundation and foundation treatment construction professional sub-contract (not graded) or construction labor qualifications, has undertaken similar project construction performance, and has the ability to undertake bidding projects in terms of personnel, equipment, funds, etc.;
4.3 Good credit and financial status;
4.4 Qualified suppliers of project types registered on the procurement platform;
4.5 Other requirements: The bidder must promise to implement the relevant provisions of the "Special Measures for the Management of Collaborative Teams" of the bidder and the relevant requirements for Wudongde construction market access. The detailed rules are listed in the tender documents after the official release.
4.6 This tender (accepted not accepted) Consortium bid.
5. Acquisition of bidding documents
5.1 Those who wish to participate in tenders, please sign in to participate in prequalification during the tender announcement period: October 18, 2016 to October 25, 2016;
5.2 Potential bidders who have passed the pre-qualification check on October 25, 2016 to download the bidding documents.
6. Submitting bid documents
6.1 Deadline for submission of bids is 15:00 on November 1st, 2016. Overdue bid documents uploaded or not uploaded to the designated address will not be accepted by the bid inviter.
6.2 Tender costs
All costs incurred in the preparation and bidding of tender documents shall be borne by the bidders.

Contact: Chen Yumin

Cell phone

phone

mailbox:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderer.


The bidder intends to subcontract the construction of the construction project for the first phase of the Wudongde Hydropower Station dam civil engineering and metal structure installation engineering seepage control project. The project funds will come from the construction progress of the project owner. The project has tender conditions and is now undergoing open bidding.
3. Project overview and scope of tender
2.1 Project Overview: The Wudongde hydropower station on the Jinsha River is the most upstream cascade power station among the four hydropower stations (Udongde, Baihetan, Xiluodu, Xiangjiaba) on the lower reaches of the Jinsha River. This project focuses on power generation and flood control. Block sand and improve downstream shipping conditions and other comprehensive benefits.
2.2 The bidding project is mainly for the construction of the I-Bid Section of the Wudongde Hydropower Station Dam Civil Engineering and Metal Structure Installation Engineering Osmosis Control Project. The start-up to completion time is from November 1, 2016 to October 31, 2018. 720 days (or actual start and finish times).
2.3 The main project quantities of this tendering project: Consolidation grouting for the dam 1#~6# of the dam project, connecting the bank slope section of EL850m~EL988m on the left bank, the main curtain grouting and the foundation drainage hole, and the bank slope contact grouting project, the main project Quantity: Consolidation grouting 54358m, connecting curtain, main curtain grouting 19465m, drainage hole 1691m, bank slope contact grouting 10151m2.
4. Bidder qualification requirements
4.1 has an independent legal personality;
4.2 It must have water conservancy and hydropower general contracting, or foundation and foundation treatment construction professional sub-contract (not graded) or construction labor qualifications, has undertaken similar project construction performance, and has the ability to undertake bidding projects in terms of personnel, equipment, funds, etc.;
4.3 Good credit and financial status;
4.4 Qualified suppliers of project types registered on the procurement platform;
4.5 Other requirements: The bidder must promise to implement the relevant provisions of the "Special Measures for the Management of Collaborative Teams" of the bidder and the relevant requirements for Wudongde construction market access. The detailed rules are listed in the tender documents after the official release.
4.6 This tender (accepted not accepted) Consortium bid.
5. Acquisition of bidding documents
5.1 Those who wish to participate in tenders, please sign in to participate in prequalification during the tender announcement period: October 18, 2016 to October 25, 2016;
5.2 Potential bidders who have passed the pre-qualification check on October 25, 2016 to download the bidding documents.
6. Submitting bid documents
6.1 Deadline for submission of bids is 15:00 on November 1st, 2016. Overdue bid documents uploaded or not uploaded to the designated address will not be accepted by the bid inviter.
6.2 Tender costs
All costs incurred in the preparation and bidding of tender documents shall be borne by the bidders.